{"id":32383,"date":"2023-04-20T13:26:19","date_gmt":"2023-04-20T11:26:19","guid":{"rendered":"https:\/\/puente-colgante.com\/aspectos-tecnicos-e-innovacion\/"},"modified":"2023-06-14T13:11:03","modified_gmt":"2023-06-14T11:11:03","slug":"aspectos-tecnicos-e-innovacion","status":"publish","type":"page","link":"https:\/\/puente-colgante.com\/en\/aspectos-tecnicos-e-innovacion\/","title":{"rendered":"Technical aspects and innovation"},"content":{"rendered":"\t\t
<\/div><\/div>\t<\/div>\r\n\t<\/div>\r\n<\/div>\r\n\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
<\/div><\/div>\t<\/div>\r\n\t<\/div>\r\n<\/div>\r\n\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\tIt’s suspended by 70 steel cables called hangers. In fact, the structure is not welded or riveted to the towers or pillars, but only supported by these hangers, which bear a significant portion of the weight, and supported by the corbels, a kind of capitals attached to the towers that help to evenly distribute the weight of the deck. Hence the nickname “hanging”, as the crossbeam truly hangs from the towers, although many associate it with the suspension of the gondola.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
In its origins, a cable and pulley traction system was used, powered by a steam boiler located in one of the two towers of the Bridge. The current gondola is the fifth in the history of the Bridge. Vehicle and passenger transportation takes place inside it, hanging from a 36-wheel, 25-meter-long carriage that moves along the tracks of the upper horizontal beam. The control station is located on the ground floor of one of the towers in Portugalete, for better visibility.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t The current travel duration between the two banks of the river is one minute and a half.<\/p>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t The gondola has a capacity for 6 vehicles (passenger cars) and 200 passengers (100 in each cabin), and can be supplemented with 6 motorcycles or bicycles. INNOVATION IN THE BRIDGE<\/p>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t The existing gondola was substituted for another more in line with the technological progress. Preparation of the draft project for a suspension bridge with a mobile vehicle adapted to large estuaries, in secret conversations between Alberto Palacio and Ferdinand Arnodin.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t November 5. February 20. February 12. \u00a0April 7. Construction of the Vizcaya Bridge, with Alberto Palacio as works director, Ferninand Arnodin as constructor and with the technical assistance of the engineer A. Brull.<\/p> The pillars are made of profiles forged in Le Creusot. The replaceable cables are of mild steel from the Firminy wireworks. The wiring by the workshops of Ferdinand Arnodin in Chateauneuf-sur-Loire. The deck is made up of a beam with Saint Andrew crosses made of mild steel by the Altos Hornos de Vizcaya blast furnace rolling mill, Assembled at the Zorroza workshops in Bilbao. The suspension of the beam is mixed, using vertical suspension cables and inclined shrouds. The energy supplied by a two cylinder vertical steam boiler with water pump, produced by Henri David in Orleans, moves the cables which pull the gondola. The motor system is placed in a large hut placed between the two towers on the Getxo side.<\/p> The original conception by Alberto Palacio to obtain the movement was a cart moved by compressed air (Mekarsky system).<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t The company is concerned about the complication of a steam boiler situated high up and the services for its operation.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t An electric motor is installed to replace the boiler in the same place. The lift which was not able to be installed before due to the lack of electric supply is installed in Tower 2. The stairs are passed to Tower 1.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
<\/span><\/div>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
Two panoramic elevators have been installed to access the walkways for tourist visits, one on each side of the Bridge, accessible through the terraces.
The Puente Bizkaia was the first transporter bridge built in the world, but its technological uniqueness does not only lie in the development and operation of a transfer mechanism (gondola, carriage, and rail), but also in its spectacular iron structure and the use of steel cables to secure that structure.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
<\/div><\/div>\t<\/div>\r\n\t<\/div>\r\n<\/div>\r\n\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\tAt the beginning the innovation was orientated towards the technology:<\/strong>
<\/span><\/h3>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
Innovative boarding halls were constructed with automatic systems.
The payment systems were unified, eliminating the personal ticket offices and installing self-payment systems.
The entire installation is automated via the control room.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\tOriented towards the market, opening new business lines and boosting the
<\/span><\/h3>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\tChronology of the Construction<\/h2>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
1887<\/h2>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
1887<\/h2>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
Simultaneous presentation of the invention patent application by Alberto Palacio, in Bilbao, and Ferdinand Arnodin, in Par\u00eds.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t1888 <\/h2>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
Presentation of the Vizcaya Bridge construction project.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t1890<\/h2>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
Concession of the licence to build the bridge between Portugalete and Getxo, after overcoming the technical reluctance of the engineers from the Ministry for Promotion\u2019s Public Works Department.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t1890<\/h2>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
Constitution of the company \u201cMart\u00edn Alberto Palacio y Compa\u00f1\u00eda\u201d with the aim of constructing and operating the Bridge.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\tmay<\/span><\/br>1890<\/br>july<\/span><\/br>1893<\/h2>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
1894<\/h2>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
1901 <\/h2>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t